28
July 2002
Maturity Levels 4 and 5 and the Unstaged PAs
•Maturity Level 4:
—no PAs are staged at this level
—to achieve ML4, ML3 must be achieved, plus capability level 4 on selected PAs
•Maturity Level 5:
—PA 23 Innovation is staged at ML5
—to achieve ML5, all staged PAs must achieve capability level 3, and capability level 5 must be achieved on selected PAs
•Two iCMM PAs are not staged: PA 10 Operation and Support; PA 17 Information Management
—their content is not included in any CMM benchmarks